President Akufo-Addo Inspects Work On Nkawkaw Town Roads

President Akufo-Addo on Saturday, 12th October, 2019, inspected ongoing works on the construction of 10 kilometres of roads in Nkawkaw, in the Eastern Region.1 min


7741
1.6k shares, 7741 points

President Akufo-Addo on Saturday, 12th October, 2019, inspected ongoing works on the construction of 10 kilometres of roads in Nkawkaw, in the Eastern Region. 

The Eastern Regional Minister, Hon. Eric Kofi Darfuor, in taking President Akufo-Addo on a tour of the roads, indicated that roads being constructed were selected to improve road transpprt network connectivity, accessibility, as well as reduce travel time and improve safety for the movement of goods and people in Nkawkaw.

He added that 3.40 kilometres of these roads are deteriorated, existing paved roads requiring improvements, including minor realignment, widening, construction of drainage structures, and surfacing, whilst 6.60km are unpaved roads requiring construction.

Bituminous surfacing of Nkawkaw SHS-Domeabra Road (1.9kms); Agyakwa Hospital Road (1.3kms); Adoagyiri/White House Road (1.0km); ADB-Assembly Road (0.45kms); Betrams-Asuogya Road (2.1kms); Krofrom Street (0.7kms); Starting Point Road (2.0kms); Mococo Street (0.6kms); and Denkyem Street (0.3kms) are taking place.

The Eastern Regional Minister told the President that the road projects are being undertaken by Messrs Berock Ventures Limited, with a contract duration of 27 months, with an expected completion date of 21st March, 2020.

President Akufo-Addo urged the contractor to ensure that the town roads are completed on schedule.

In all, the Department of Urban Roads is undertaking the rehabilitation and maintenance of some 153 kilometres of roads in the Eastern Region.

They are Koforidua Town Roads (26.5kms); Begoro Town Roads (17kms); Kwabeng Town Roads (10kms); Kyebi Town Roads (10kms); Asamankese Town Roads (10kms); Kade Town Roads (10kms); Akwatia Town Roads (10kms); Okere Town Roads (10kms); and Akim Oda Town Roads (10kms).

The rest are Akyem Akropong Town Roads (7.5kms); Suhum Town Roads (5kms); Apedwa Town Roads (4kms); Akroso Town Roads (2.5kms); Amamprobi by-pass (2.5kms); and Abomosu Town Roads (1.5kms).

These projects are estimated at a cost of GHc387,650,853.08, with contractors having commenced work on all the projects listed above. Indeed, the asphaltic overlay of town roads in Koforidua and Kyebi have been substantially completed.

Additionally, 42 kilometres of town roads in Odumasi Krobo, Asesewa, Akim Oda, Koforidua, Peduase, and Asamankese, are undergoing procurement processes.  


Like it? Share with your friends!

7741
1.6k shares, 7741 points

What's Your Reaction?

hate hate
2256
hate
confused confused
967
confused
fail fail
3223
fail
fun fun
2901
fun
geeky geeky
2578
geeky
love love
1611
love
lol lol
1934
lol
omg omg
967
omg
win win
3223
win
Ghananewsxyz

We bring you all the news in Politics, Entertainment, Sports, Business, Religion & Among Others in Ghana and Beyond!

Comments

comments

close

Ad Blocker Detected!

Choose A Format
Personality quiz
Series of questions that intends to reveal something about the personality
Trivia quiz
Series of questions with right and wrong answers that intends to check knowledge
Poll
Voting to make decisions or determine opinions
Story
Formatted Text with Embeds and Visuals
List
The Classic Internet Listicles
Countdown
The Classic Internet Countdowns
Open List
Submit your own item and vote up for the best submission
Ranked List
Upvote or downvote to decide the best list item
Meme
Upload your own images to make custom memes
Video
Youtube, Vimeo or Vine Embeds
Audio
Soundcloud or Mixcloud Embeds
Image
Photo or GIF
Gif
GIF format